• The purpose of the hydrogeological /geophysical survey (as required by the Water Resources Management Authority) is to explore the possibility of identifying a groundwater source for any Water Supply Project. The studies aim at evaluating the groundwater situation as it is, through collecting any available relevant data (e.g. drilling logs), evaluating data from the surrounding boreholes, carrying out field geophysical measurements and reviewing any available previous survey report to form the hydrogeological geophysical survey report which will be in accordance with the clients preferences and the new regulations from the Water Resources Management Authority.


  • It is also worth to note that unlike in the past, it is now required by the National Environment Management Authority (NEMA) to conduct an Environmental Impact Assessment for any borehole drilling project. The consultant has therefore covered this aspect in details below, together with other other consultancy services pertaining to the later drilling stage such as drilling supervision works.


  • Anacon undertakes Environmental Impact Assessment report preparation alongwith Hydrogeological studies of specific site.


List of Projects related to Geology and Hydrogeological surveys conducted by Anacon Laboratories Pvt. Ltd. :
Sr.No. Project Proponent Project Details & Plant Cap. Report Presentation Period
1. Lafarge India Ltd., Raipur, C.G. Identification of route cause for river bed drying in summer After identifying the causes, suggested four alternatives with costing for implementation Jan – Jun 2003
2. Europratik Ispat Ltd., Raipur, C.G. Hydrogeological survey 50 Acre ALow cost water reservoir suggested April 2003
3. Kinetic Motors Ltd.,Pithampur, M.P. Hydrogeological survey in 50 Acre With respect to construction of hazardous waste disposal using DRASTIC model March 2005
4. Force Motors Ltd., (Bajaj Tempo Ltd.,) Pithampur M.P. Hydrogeological survey in 70 Acre With respect to construction of haz waste disposal using DRASTIC model April 2005
5. Ultra Tech Cement Ltd.,Chandrapur. Maharashtra 3 km2 river bed survey for water availability in lean season Proposed jack well location suggested with crises mgmt. plan for water availability May 2005
6. API – Ispat & Power Tech. Raipur. C.G. Hydrogeological survey 65 Acre Findings of the report avoided shifting of the project site May 2005
7. Gupta Coal Washery, Jharsuguda, Orissa. Hydrogeological survey in 50 Acre With respect to construction of hazardous waste disposal using DRASTIC model June 2005
8. Pratibha Syntex Ltd., Pithampur, M.P. Hydrological Survey in 75 Acre With respect to construction of hazardous waste disposal using DRASTIC model Feb. 2006
9. Nakoda Ispat Ltd., Siltara, Raipur C.G. Hydrogeological Survey 25 Acres To know ground water availability March 2006
10. Prakash Industries Ltd. Raipur, C.G. Rod mill and tube mill Rainwater harvesting in 32 acre area April 2006
11. Lafarge Arasmeta Captive Power Co. Pvt. Ltd., Bilaspur, C.G. 50 MW Thermal Power plant Study of watershed development in 314 km2 using Remote sensing satellite imagery Jan – Jun 2006
12. Lafarge Arasmeta Captive Power Co. Pvt. Ltd., Bilaspur, C.G. 50 MW Thermal Power plant Rain water harvesting in plant June 2006
13. TATA Steel Ltd., Jamshedpur, C.G. River hydrology study for Indravati river To assess impact/s of flood over the proposed steel plant and township Jan. – Jun 2006
14. TATA Steel Ltd., Jamshedpur, C.G. Geological Study 314 km2 area To assess availability, quality & quantity of economical extractable minerals. Jan. – Jun 2006
15. TATA Steel Ltd., Jamshedpur, C. G. Hydrogeological Survey 314 km2 area To assess the ground water regime within the study area. Jan. – Jun 2006
16. Comprehensive hydrogeological survey, Korba, CG STCLI Coal Washery and 2 X 25 MW Power plant To assess the ground water regime within the study area. Jan. – Jun 2007
17. Rasoya Proteins Ltd., Vani, Maharashtra Hydrogeological Survey at Wani site 14 acres. To assess the ground water regime within the study area. May 2007
18. Toyo Engg. Pvt.Ltd. Mumbai Hydrogeological Survey in 14 acres at Dharikheda site To assess the ground water regime within the study area. Nov. 2008
19. M/s Riverstone Ltd. Recuperation tests To assess the ground water regime within the study area. May 2008